See what a lender will flag before you’re in front of one.

Upload the project documents you already have. Keystone sorts them, finds what’s missing, scores feasibility, and builds the analysis you’ll share with lenders.

EXISTING BLDGBuildable 11.4 ac50 ft setback metInterconnection
Feasibility
68 /100
Proceed with Conditions
Engineering site plan of a large commercial rooftop solar installation, with rows of panels laid out across three roof sections
Engineering site plan of a large commercial rooftop solar installation, with rows of panels laid out across three roof sections

The problem

Find the risk now, not the week before closing.

A title exception, a study result, a zoning condition nobody checked. The expensive problems in development are the ones that surface late, when the schedule has no room left.

Diligence itemUnderwriting
Site controlReviewed
Zoning and permittingReviewed
Environmental screeningReviewed
Interconnection studyWaiting on the utility
Title commitmentMissing, flagged today

Keystone surfaces every item in one pass. Because our underwriting team reads the same record, each one is reviewed as it lands instead of months later in a diligence sprint.

Your documents

Upload what you have. See what's missing.

Drop in site plans, leases, utility bills and studies as they are, or as a single ZIP file. Keystone files each document and lists the gaps that would hold up financing, in priority order.

site_plan_v3.pdfSite plan
LOI_signed.pdfSite control
utility_bills_2025.xlsxUtility data
interconnection_app.pdfInterconnection
survey.pdfSurvey
Data room readiness
0%
Sorting documents
Priority actions
Order a Phase I environmental assessmentEnvironmental consultant
Add the title commitmentTitle agent
Upload the interconnection study once receivedUtility

Illustrative example

Feasibility

A clear answer on whether to keep going, and what stands in the way.

  • Environmental Screening

    No mapped wetlands or flood risk

    Pass
  • Land Use & Zoning

    Ground-mount solar allowed

    Pass
  • Incentive Eligibility

    Qualifies for the state community solar program

    Pass
  • Grid Proximity

    Substation 0.4 miles away

    Pass
  • Grid Access

    Interconnection study pending

    Condition
  • Construction & Execution Risk

    Survey needs updating

    Condition
Feasibility result

Proceed with Conditions

  • Grid access depends on the pending interconnection study
  • Construction risk needs an updated survey

Your team reviews and approves each gate before the project moves on.

Illustrative example

What you get

Materials a lender can read in one sitting.

On the left is the folder most projects start from. On the right is what Keystone produces from it.

The folder you have
Project files
old
site_plan_FINAL_v2(1).pdf
bills.xlsx
from utility
scan0042.pdf
scan0043.pdf
notes_call_w_EPC.docx
LOI signed.pdf
What Keystone hands you
Bankability analysis

Bankability analysisSummary for lenders and buyers

Due diligence report

Due diligence reportWith permitting requirements

Financial model

Financial model25-year, with debt sized to your coverage target

Next step

Ready to raise? The work carries straight into financing.

If you raise on Climatize, our underwriting team starts from the record Keystone built, including the credit memo. Because that record fills in as you develop, the underwriting work advances alongside it instead of starting at the end. If you finance elsewhere, the analysis is yours to share.

Find

Oasis

Screens and ranks sites around the location you choose.

Prepare

Keystone

Runs feasibility and diligence and gets the project ready for lenders.

Guilderland Community SolarDSCR 1.35x

FAQs

See how Keystone uses your existing documents, what it generates in return, and how it handles missing data.

Does a person review the results?

Do I have to raise on Climatize?

Which projects does it support?

How long does it take?

What if some documents are missing?